Nova Chemicals, a chemical manufacturer, needed a clearer way to move planning and scheduling data between IBP, Aspen, SAP, and production scheduling. The issue was not a lack of data. It was the time, complexity, and risk created by too many disconnected handoffs.
PlanetTogether APS was evaluated as a way to connect scheduling logic, material planning, and production constraints in one planning process. The goal was to reduce manual scheduling effort, improve raw material visibility, and make production plans easier to update.
Answer Capsule: This chemical APS case study shows how Nova Chemicals addressed planning complexity across IBP, Aspen, SAP, and production scheduling. PlanetTogether APS helped create a more connected workflow for order generation, production sequencing, raw material forecasting, and schedule-based planning decisions.
Nova Chemicals needed to simplify how planning and scheduling data moved between IBP, Aspen, SAP, and the production schedule. Each system played an important role, but the handoffs between systems created delays, rework risk, and potential data inconsistencies.
In chemical manufacturing, those issues can affect more than the schedule. They can also affect raw material planning, reactor grade sequencing, production timing, and the planner’s ability to respond when demand or supply changes.
The scheduling workflow depended on several systems, including Integrated Business Planning (IBP), Aspen, and SAP. These systems supported important planning tasks. However, data still had to move through multiple steps before planners could use it in the production schedule.
As a result, planners needed a more connected process for production scheduling, raw material forecasting, and schedule updates.
Chemical manufacturers should consider APS when planning complexity slows scheduling decisions, material planning, or production changes.
Nova Chemicals evaluated PlanetTogether APS to create a more structured planning and scheduling workflow. The APS model focused on automated order generation, sequencing rules, material forecasting, and direct schedule-based reporting.
Rather than relying only on manual schedule changes, planners could use APS logic to support more consistent decisions around reactor grades, raw materials, and production timing.
In this workflow, PlanetTogether APS can support automated order generation across a defined planning period. This reduces manual planning effort and gives planners a more consistent view of future production requirements.
Planners can still make manual changes when needed. However, APS rules can help enforce production sequencing and reactor grade logic, which supports a more realistic schedule.
PlanetTogether APS can apply sequencing rules and reactor grade logic to reduce gaps in the production schedule. This gives planners a clearer view of where work can run and where constraints may still exist.
The material consumption forecast report gives planners a consolidated view of raw material requirements. This helps the team compare production plans against expected material demand before shortages create schedule risk.
The forecast report can use data directly from the PlanetTogether schedule. Therefore, raw material requirements stay aligned with current production plans.
A direct link between scheduling and material forecasting reduces the risk of mismatched data. As a result, planners can spot material issues earlier and adjust the production plan with better context.
The automated feed from PlanetTogether keeps the forecast report current as the schedule changes. This reduces manual updates and lowers the risk of planning errors caused by outdated data.
The APS workflow gave Nova Chemicals a more connected way to manage production scheduling, material forecasting, and system data. Instead of relying on disconnected handoffs between IBP, Aspen, SAP, and scheduling, planners could work from one schedule-driven planning process.
This helped reduce the risk of data delays, inconsistent assumptions, and manual planning errors. It also gave the team a clearer way to connect production schedules with raw material requirements.
Nova Chemicals needed to reduce planning complexity between IBP, Aspen, SAP, and production scheduling. The goal was to improve data flow, raw material visibility, and schedule reliability.
APS can help chemical manufacturers model finite capacity, sequencing rules, raw material requirements, and what-if schedule changes in one planning environment.
Raw material forecasting matters because production timing can change material needs. A schedule-driven forecast helps planners see expected material requirements before shortages affect production.
Controlled flexibility means planners can still adjust the schedule manually while APS logic applies rules for constraints, sequencing, and production feasibility.
A chemical manufacturer should consider APS when manual scheduling, disconnected systems, material planning gaps, or sequencing constraints make the production schedule hard to trust.
Compare your current manual scheduling, ERP workflow, and material planning process with PlanetTogether APS. In a demo, you can review automated order generation, finite-capacity scheduling, and what-if scheduling.
You can also discuss reactor grades, raw materials, and sequencing rules with the PlanetTogether team.
Request a PlanetTogether APS demo.