Four Factors for Running an Effective Kanban Replenishment Meeting

11/21/22 3:51 PM

Within Kanban, there are three critical components when ensuring that the methodology gets the project off of the ground successfully. These components include strategy review, the replenishment/commitment meeting, and the standup meeting. 

Four Factors for Running an Effective Kanban Replenishment Meeting

Utilizing these components can greatly aid your Kanban operation and will effectively ensure that all requirements are met. While these are effective, there are also four key factors that teams need to consider for running an effective Replenishment Meeting. These are based off of various experiences utilizing Kanban for company’s product development. Therefore, here are the four factors for running an effective Kanban Replenishment Meeting. 

4 Factors for Running Effective Kanban Replenishment Meeting 

The four factors for running an effective Kanban Replenishment Meeting pertain to the following: 

  • Clear Understanding of the Replenishment Meeting Objective - The entire objective behind the Replenishment Meeting (RM) is to make sure the stakeholders and teams are shortlisting and selecting the right set work items to work on at any point of time. Entirely depending on the context of the team, this may be very simple to very complex. 
  • Replenishment Criteria - The criteria pertaining to pulling work on to the board are the most contentious part of the process. Depending on the number of stakeholders a team may be supporting, the demand vary depending on a variety of factors - risk, value, or expected ROI, and those defined jointly by the stakeholders. The usual measures most used are probably the urgency and the priority. 
  • Replenishment Workflow - The process of workflow that is needed to ensure that stakeholders obtain the agreed set of criteria for work to be pulled is critical so that the team unambiguously pull the right set of work during each replenishment meeting. The process that is normally utilized for replenishment for various teams and contexts can be very different - and elaborate - and may need to be reflected either in a separate swim lane on the delivery team’s board. 
  • Collaborative Replenishment - Another key success factor is to have all stakeholders who are impacted through the team’s work - or depend on it for their own work - to participate in meetings on a regular basis. Depending on the various customers or stakeholders a team supports, this may also be a contentious process. There are a variety of conflicting demands on the team that make it very challenging for everyone to come to an agreement on the exact set of work items to be pulled during each cycle. 

A software that can easily aid with implementation of Kanban planning and methodology is PlanetTogether’s Advanced Planning and Scheduling Software. PlanetTogether’s APS software is a must have for manufacturers that are seeking to improve efficiency within a manufacturing operation while cutting costs and increasing profitability. Advanced Planning and Scheduling Software is essential for manufacturing operations around the globe in order to maintain a competitive edge and keep up with industry technology. 

Advanced Planning and Scheduling Software 

Advanced Planning and Scheduling (APS) software has become a must for modern-day manufacturing operations due to customer demand for increased product mix and fast delivery combined with downward cost pressures. APS can be quickly integrated with a ERP/MRP software to fill gaps where these system lack planning and scheduling flexibility and accuracy. Advanced Planning and Scheduling (APS) helps planners save time while providing greater agility in updating ever-changing priorities, production schedules, and inventory plans.

  • Create optimized schedules balancing production efficiency and delivery performance
  • Maximize output on bottleneck resources to increase revenue
  • Synchronize supply with demand to reduce inventories
  • Provide company-wide visibility to capacity
  • Enable scenario data-driven decision making

Implementation of Advanced Planning and Scheduling (APS) software will take your manufacturing operations to the next level of production efficiency, taking advantage of the operational data you already have in your ERP.

Related What If Video

 APS Resources

Topics: Kanban

0 Comments

No video selected

Select a video type in the sidebar.

Download the APS Shootout Results

LEAVE A COMMENT

PlanetTogether APS: A GPS System for your Supply Chain - See Video



Recent Posts

Posts by Topic

see all
Download Free eBook
Download Free APS Implementation Guide
Download Free ERP Performance Review