Job Operation Subassemblies

Key Concepts

In PlanetTogether, the Subassemblies tab of the Operation provides information by showing which operations/MOs that are providing material for the current Operation.

Example

For example, if you have a Manufacturing Order that is producing "Item1" and is linked to a different MO by a Successor MO link, the Operation that produces "Item1" will display in the Subassemblies grid for the Operation of the second MO.

Note: The information on the Subassemblies grid cannot be imported into PlanetTogether. This can be set up by linking Predecessor and Successor Manufacturing Orders.