Release Notes: Version 11.31

(August 24, 2018)

New Features:

  • Gantt labels localized:
    • Some Gantt labels were not being localized.

Corrected Issues:

  • Activities View Error – Input string was not in the correct format:
    • Fixed an issue that would prevent saving a Job in the Activities grid activity update control if a Material Requirement was configured without specifying a warehouse.
  • Split Operation Activity Demand is not rounded.
  • Job fails to schedule on move:
    • Fixed an issue that could cause an operation to fail to schedule after a move.
  • Prevent entry of material requirements for 0 quantity:
    • Added validation to reject material requirements of 0 or less.
  • Manual Scheduling Only doesn’t work for drag-and-drop from Jobs grid:
    • If you drag-and-drop a job from the Jobs window on a Manual Scheduling Only resource, the job doesn’t schedule.
  • Jobs being pushed past planning horizon when some operations are finished:
    • Fixed an issue that caused jobs to schedule past the planning horizon when some operations were finished.
  • Gantt Draw Loop Exception when selecting multiple activity blocks.
  • Unable to close the login dialog after certain login failures.
  • Duplicate buy-direct materials causing an error:
    • Added validation for duplicate buy-direct material requirements.
  • Transfer orders aren’t creating adjustments for the destination warehouse:
    • Adjustments for transfer orders aren’t being created for the destination warehouse.
    • In the provided example, a transfer order is scheduled to transfer material from an inventory that never has enough material to fulfill the transfer order so that a
      negative adjustment for the material is created for the source inventory at the
      planning horizon, but no corresponding adjustment is created for the inventory of
      the destination warehouse.
    • Resolution: A corresponding adjustment is created for the destination warehouse.

Minor Changes:

  • Client Freezes on Data Refresh:
    • Fixed an issue when importing a large quantity of capacity intervals that could cause the
      client to freeze.
  • Activity set to Manual Update Only when saved due to incorrect production status calculation:
    • Fixed an issue that would cause Waiting operations the be marked as manual updates only when the job is saved with the Job Dialog.
  • Inventory: Detail doesn’t show Forecast Adjustments:
    • Forecast demand now displayed in the Inventory detail plot if the "Include Forecast in Net Inventory" option is enabled.
  • Gantt: Material: Latest Material Source Line
    • Latest Material Source has been added as a Gantt line and materials grid column. This will show the material source that is used closest to where the operation is scheduled.
    • This can be useful to see if an operation can be moved earlier on a resource.